{"id":1831,"date":"2026-11-20T16:43:40","date_gmt":"2026-11-20T16:43:40","guid":{"rendered":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/?p=1831"},"modified":"2026-11-20T06:54:18","modified_gmt":"2026-11-20T06:54:18","slug":"how-should-a-standing-seam-roof-be-planned-for-solar","status":"publish","type":"post","link":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/","title":{"rendered":"How Should a Standing Seam Roof Be Planned for Solar?"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-medium wp-image-1832\" src=\"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-20-01.52.08-300x230.png\" alt=\"standing seam roof solar mounting options\" width=\"300\" height=\"230\" srcset=\"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-20-01.52.08-300x230.png 300w, https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-20-01.52.08-768x590.png 768w, https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-20-01.52.08.png 820w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Standing seam roof solar mounting options should be evaluated before the roof specification and solar layout are finalized. Compatible seam clamps can often support a solar mounting system without penetrating the roof panels, but the complete installation still needs structural review, manufacturer coordination, and careful detailing.<\/p>\n<h2 id=\"key-takeaways\" class=\"font-semibold leading-tight text-pretty mb-2 mt-4 [[data-has-inline-images]_&amp;]:clear-end text-lg first:mt-0 md:text-lg [hr+&amp;]:mt-4\">Key Takeaways<\/h2>\n<ul class=\"marker:text-secondary list-disc pl-8\">\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Select mounting hardware tested for the exact seam profile, panel material, and thickness.<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Compare rail-based and direct-attachment systems against the proposed roof and solar layout.<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Check the entire load path, including panels, clips, fasteners, and supporting structure.<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Preserve the roof\u2019s intended thermal movement.<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Coordinate snow management, electrical routes, maintenance access, and warranty requirements.<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Keep roof specifications and installation records for a future solar project.<\/p>\n<\/li>\n<\/ul>\n<h2 id=\"which-solar-mounting-options-suit-standing-seam-ro\" class=\"font-semibold leading-tight text-pretty mb-2 mt-4 [[data-has-inline-images]_&amp;]:clear-end text-lg first:mt-0 md:text-lg [hr+&amp;]:mt-4\">Which Solar Mounting Options Suit Standing Seam Roofing?<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Two common approaches use clamps attached to the raised seams.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">A rail-based system connects rails to compatible seam clamps, with solar modules secured to the rails. A direct-attachment system connects modules through purpose-designed mounting components without conventional continuous rails.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Both require a coordinated design. Neither approach is automatically suitable for every standing seam roof.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">The choice depends on the seam spacing, module dimensions, attachment locations, loading, and electrical bonding requirements. Ask the solar designer to explain why the proposed configuration suits the specific roof.<\/p>\n<h2 id=\"why-must-clamps-match-the-exact-seam\" class=\"font-semibold leading-tight text-pretty mb-2 mt-4 [[data-has-inline-images]_&amp;]:clear-end text-lg first:mt-0 md:text-lg [hr+&amp;]:mt-4\">Why Must Clamps Match the Exact Seam?<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Standing seam profiles differ in shape and construction. A clamp that fits around a seam is not necessarily tested or suitable for it.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Confirm:<\/p>\n<ul class=\"marker:text-secondary list-disc pl-8\">\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Roof manufacturer and panel designation<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Seam shape and dimensions<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Steel or aluminum construction<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Panel thickness<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Applicable clamp test data<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Required installation torque<\/p>\n<\/li>\n<\/ul>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\"><strong>Non-penetrating clamps<\/strong> can still damage roofing if incorrectly selected or installed. Avoid substituting hardware based only on appearance or using a generic tightening value.<\/p>\n<h2 id=\"does-clamp-testing-prove-the-roof-can-support-sola\" class=\"font-semibold leading-tight text-pretty mb-2 mt-4 [[data-has-inline-images]_&amp;]:clear-end text-lg first:mt-0 md:text-lg [hr+&amp;]:mt-4\">Does Clamp Testing Prove the Roof Can Support Solar?<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">No. Clamp test data addresses a particular connection, not the capacity of the complete roof.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">A structural assessment should consider the solar equipment\u2019s weight, wind uplift, snow loads, and how those forces travel through the roof system.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Relevant components include:<\/p>\n<ul class=\"marker:text-secondary list-disc pl-8\">\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Module attachments<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Clamps and seams<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Roof panels and attachment clips<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Clip fasteners<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Decking or structural supports<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">The building structure below<\/p>\n<\/li>\n<\/ul>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">A strong clamp cannot compensate for an inadequate connection elsewhere in the load path.<\/p>\n<h2 id=\"how-can-solar-attachments-affect-thermal-movement\" class=\"font-semibold leading-tight text-pretty mb-2 mt-4 [[data-has-inline-images]_&amp;]:clear-end text-lg first:mt-0 md:text-lg [hr+&amp;]:mt-4\">How Can Solar Attachments Affect Thermal Movement?<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Metal roof panels expand and contract as temperatures change. The roof\u2019s clip and attachment arrangement accommodates that movement.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Incorrectly positioned clamps or other connections can interfere with the intended behaviour. Whether a clamp can sit above a clip depends on the roof and mounting system.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Have the roof and solar teams coordinate attachment positions rather than assuming clamps can go anywhere along a seam.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">This matters particularly on long panel runs, where accumulated movement can be significant.<\/p>\n<h2 id=\"what-should-be-planned-for-snow-and-maintenance\" class=\"font-semibold leading-tight text-pretty mb-2 mt-4 [[data-has-inline-images]_&amp;]:clear-end text-lg first:mt-0 md:text-lg [hr+&amp;]:mt-4\">What Should Be Planned for Snow and Maintenance?<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">The solar layout should account for snow movement, potential accumulation, roof drainage, and access.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">During November and December planning, review entrances, paths, lower roofs, and other areas below the proposed array. Snow-retention equipment needs its own engineered layout and compatible attachments.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Also coordinate:<\/p>\n<ul class=\"marker:text-secondary list-disc pl-8\">\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Electrical cable support<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Any necessary roof penetrations<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Access to flashings and roof equipment<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Applicable access and setback requirements<\/p>\n<\/li>\n<li class=\"py-0 my-0 prose-p:pt-0 prose-p:mb-2 prose-p:my-0 [&amp;&gt;p]:pt-0 [&amp;&gt;p]:mb-2 [&amp;&gt;p]:my-0\">\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Future inspection and repair procedures<\/p>\n<\/li>\n<\/ul>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">A clamp-mounted array may avoid mounting penetrations while still requiring carefully detailed cable or service entries.<\/p>\n<h2 id=\"what-if-solar-will-be-added-later\" class=\"font-semibold leading-tight text-pretty mb-2 mt-4 [[data-has-inline-images]_&amp;]:clear-end text-lg first:mt-0 md:text-lg [hr+&amp;]:mt-4\">What If Solar Will Be Added Later?<\/h2>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Keep the roof profile, panel thickness, clip layout, structural information, and warranty documents accessible.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">Ask the roofing contractor to record concealed attachment details before completion. A future installer should not have to guess how the roof was assembled.<\/p>\n<p class=\"my-2 [&amp;+p]:mt-4 [&amp;_strong:has(+br)]:inline-block [&amp;_strong:has(+br)]:align-top\">London Eco-Metal manufactures and installs steel and aluminum roofing. If you are considering a standing seam roof with future solar, ask the team which available profiles can be evaluated for that purpose. Coordinating the roof specification with a qualified solar designer early helps establish compatible mounting details without assuming every metal roof is solar-ready.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Standing seam roof solar mounting options should be evaluated before the roof specification and solar layout are finalized. Compatible seam clamps can often support a solar mounting system without penetrating the roof panels, but the complete installation still needs structural review, manufacturer coordination, and careful detailing. Key Takeaways Select mounting hardware tested for the exact &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;How Should a Standing Seam Roof Be Planned for Solar?&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":1832,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[125,113],"tags":[5,150],"class_list":["post-1831","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-steel-roof","category-steel-roofing","tag-metal-roofing-2","tag-solar-panels","entry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How Should a Standing Seam Roof Be Planned for Solar? | London ECO-METAL Manufacturing Inc.<\/title>\n<meta name=\"description\" content=\"Compare standing seam roof solar mounting options and learn how seam compatibility, structural loads, thermal movement, and snow affect the design.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How Should a Standing Seam Roof Be Planned for Solar? | London ECO-METAL Manufacturing Inc.\" \/>\n<meta property=\"og:description\" content=\"Compare standing seam roof solar mounting options and learn how seam compatibility, structural loads, thermal movement, and snow affect the design.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/\" \/>\n<meta property=\"og:site_name\" content=\"London ECO-METAL Manufacturing Inc.\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-20T16:43:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-20-01.52.08.png\" \/>\n\t<meta property=\"og:image:width\" content=\"820\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"London Eco-Metal\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"London Eco-Metal\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/2026\\\/11\\\/how-should-a-standing-seam-roof-be-planned-for-solar\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/2026\\\/11\\\/how-should-a-standing-seam-roof-be-planned-for-solar\\\/\"},\"author\":{\"name\":\"London Eco-Metal\",\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/#\\\/schema\\\/person\\\/da17df5f40500ccb5e8028802e9fc824\"},\"headline\":\"How Should a Standing Seam Roof Be Planned for Solar?\",\"datePublished\":\"2026-11-20T16:43:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/2026\\\/11\\\/how-should-a-standing-seam-roof-be-planned-for-solar\\\/\"},\"wordCount\":650,\"image\":{\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/2026\\\/11\\\/how-should-a-standing-seam-roof-be-planned-for-solar\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Screenshot-2026-11-20-01.52.08.png\",\"keywords\":[\"metal roofing\",\"solar panels\"],\"articleSection\":[\"steel roof\",\"Steel roofing\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/2026\\\/11\\\/how-should-a-standing-seam-roof-be-planned-for-solar\\\/\",\"url\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/2026\\\/11\\\/how-should-a-standing-seam-roof-be-planned-for-solar\\\/\",\"name\":\"How Should a Standing Seam Roof Be Planned for Solar? | London ECO-METAL Manufacturing Inc.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/2026\\\/11\\\/how-should-a-standing-seam-roof-be-planned-for-solar\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/2026\\\/11\\\/how-should-a-standing-seam-roof-be-planned-for-solar\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Screenshot-2026-11-20-01.52.08.png\",\"datePublished\":\"2026-11-20T16:43:40+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/#\\\/schema\\\/person\\\/da17df5f40500ccb5e8028802e9fc824\"},\"description\":\"Compare standing seam roof solar mounting options and learn how seam compatibility, structural loads, thermal movement, and snow affect the design.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/2026\\\/11\\\/how-should-a-standing-seam-roof-be-planned-for-solar\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/2026\\\/11\\\/how-should-a-standing-seam-roof-be-planned-for-solar\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/2026\\\/11\\\/how-should-a-standing-seam-roof-be-planned-for-solar\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Screenshot-2026-11-20-01.52.08.png\",\"contentUrl\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/wp-content\\\/uploads\\\/2026\\\/11\\\/Screenshot-2026-11-20-01.52.08.png\",\"width\":820,\"height\":630,\"caption\":\"standing seam roof solar mounting options\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/2026\\\/11\\\/how-should-a-standing-seam-roof-be-planned-for-solar\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How Should a Standing Seam Roof Be Planned for Solar?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/#website\",\"url\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/\",\"name\":\"London ECO-METAL Manufacturing Inc.\",\"description\":\"Affordable Metal Roofing\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/#\\\/schema\\\/person\\\/da17df5f40500ccb5e8028802e9fc824\",\"name\":\"London Eco-Metal\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3b8ffb1e4a2246c9552436d29ca30da3deb3f41e694abbb3a30ce5f76866c9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3b8ffb1e4a2246c9552436d29ca30da3deb3f41e694abbb3a30ce5f76866c9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3b8ffb1e4a2246c9552436d29ca30da3deb3f41e694abbb3a30ce5f76866c9dd?s=96&d=mm&r=g\",\"caption\":\"London Eco-Metal\"},\"sameAs\":[\"https:\\\/\\\/www.londonecometal.com\\\/\"],\"url\":\"https:\\\/\\\/www.londonecometal.com\\\/metal-roofing-ontario-blog\\\/author\\\/london-eco-roof\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How Should a Standing Seam Roof Be Planned for Solar? | London ECO-METAL Manufacturing Inc.","description":"Compare standing seam roof solar mounting options and learn how seam compatibility, structural loads, thermal movement, and snow affect the design.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/","og_locale":"en_US","og_type":"article","og_title":"How Should a Standing Seam Roof Be Planned for Solar? | London ECO-METAL Manufacturing Inc.","og_description":"Compare standing seam roof solar mounting options and learn how seam compatibility, structural loads, thermal movement, and snow affect the design.","og_url":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/","og_site_name":"London ECO-METAL Manufacturing Inc.","article_published_time":"2026-11-20T16:43:40+00:00","og_image":[{"width":820,"height":630,"url":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-20-01.52.08.png","type":"image\/png"}],"author":"London Eco-Metal","twitter_card":"summary_large_image","twitter_misc":{"Written by":"London Eco-Metal","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/#article","isPartOf":{"@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/"},"author":{"name":"London Eco-Metal","@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/#\/schema\/person\/da17df5f40500ccb5e8028802e9fc824"},"headline":"How Should a Standing Seam Roof Be Planned for Solar?","datePublished":"2026-11-20T16:43:40+00:00","mainEntityOfPage":{"@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/"},"wordCount":650,"image":{"@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/#primaryimage"},"thumbnailUrl":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-20-01.52.08.png","keywords":["metal roofing","solar panels"],"articleSection":["steel roof","Steel roofing"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/","url":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/","name":"How Should a Standing Seam Roof Be Planned for Solar? | London ECO-METAL Manufacturing Inc.","isPartOf":{"@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/#primaryimage"},"image":{"@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/#primaryimage"},"thumbnailUrl":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-20-01.52.08.png","datePublished":"2026-11-20T16:43:40+00:00","author":{"@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/#\/schema\/person\/da17df5f40500ccb5e8028802e9fc824"},"description":"Compare standing seam roof solar mounting options and learn how seam compatibility, structural loads, thermal movement, and snow affect the design.","breadcrumb":{"@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/#primaryimage","url":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-20-01.52.08.png","contentUrl":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-content\/uploads\/2026\/11\/Screenshot-2026-11-20-01.52.08.png","width":820,"height":630,"caption":"standing seam roof solar mounting options"},{"@type":"BreadcrumbList","@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/2026\/11\/how-should-a-standing-seam-roof-be-planned-for-solar\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/"},{"@type":"ListItem","position":2,"name":"How Should a Standing Seam Roof Be Planned for Solar?"}]},{"@type":"WebSite","@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/#website","url":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/","name":"London ECO-METAL Manufacturing Inc.","description":"Affordable Metal Roofing","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/#\/schema\/person\/da17df5f40500ccb5e8028802e9fc824","name":"London Eco-Metal","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/3b8ffb1e4a2246c9552436d29ca30da3deb3f41e694abbb3a30ce5f76866c9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3b8ffb1e4a2246c9552436d29ca30da3deb3f41e694abbb3a30ce5f76866c9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3b8ffb1e4a2246c9552436d29ca30da3deb3f41e694abbb3a30ce5f76866c9dd?s=96&d=mm&r=g","caption":"London Eco-Metal"},"sameAs":["https:\/\/www.londonecometal.com\/"],"url":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/author\/london-eco-roof\/"}]}},"_links":{"self":[{"href":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-json\/wp\/v2\/posts\/1831","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-json\/wp\/v2\/comments?post=1831"}],"version-history":[{"count":1,"href":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-json\/wp\/v2\/posts\/1831\/revisions"}],"predecessor-version":[{"id":1833,"href":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-json\/wp\/v2\/posts\/1831\/revisions\/1833"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-json\/wp\/v2\/media\/1832"}],"wp:attachment":[{"href":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-json\/wp\/v2\/media?parent=1831"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-json\/wp\/v2\/categories?post=1831"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.londonecometal.com\/metal-roofing-ontario-blog\/wp-json\/wp\/v2\/tags?post=1831"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}